Snapshot: October 16, 2026. Refresh before external use. This meeting packet does not close the programme’s implementation or assessment obligations. Status here is an editorial limit, not a replacement for the live backlog.
| Area | What this packet may say | What is still required | Existing owner |
|---|---|---|---|
| Standards composition | Working drafts describe the relationships | Version freeze and independent clause-level acceptance | BI-A484D58F |
| Portable reference contracts | Source examples exist | Qualified adapter/runtime coverage; examples are not universal conformance | BI-F9582C48 / BI-07A2B207 |
| Executable conformance | Assessment design is programme work | Honest requirement denominator, assertions, negative/fault vectors and genuine results | BI-2AB781FA |
| DPF specimen | DPF is the initial implementation context | Exact served runtime, scenario binding and assessment receipts | BI-9236453D / BI-F3C2EC7A |
| Synthetic expense | Operator selected isolated expense approval | Finance-owned policy, frozen thresholds, reviewer and actual assessment | BI-72ED2A22 |
| Hermes and Cursor | Reproduction is planned | Independently controlled adapter work and mediation/bypass coverage | BI-FEA232AF / BI-0E56BA38 |
| Independent implementation | External review is the proposed request | Actual participant-controlled reproduction and disclosed limitations | BI-72ED2A22 |
| White paper | Existing discussion material explains the programme | Current independent acceptance and reconciliation with delivered implementation | BI-6CC40F77 |
| Jev | TypeSafe bounded-output inference is a candidate component | Provider evaluation, domain calibration and authorized deployment if selected | Existing programme research |
| Business value | Complete-cohort metric is proposed | Measured baseline, allocation method, supervision/rework and acceptance definition | Specimen’s owning business scope |
| Governance/IP | Options are reviewable | Owner/legal decisions on rights, contributions, hosting and claims | BI-1C39CCF8 |
| Recording | Recording plan and static walkthrough are supplied | A real qualified run and reviewed capture | BI-1C39CCF8 / specimen owner |
A source test is not a runtime assessment. A reference simulation is not an independent implementation. An inconclusive or unsupported assertion is not a pass. A published standard or badge cannot grant tool authority. Correct refusal and successful business completion are distinct outcomes; evaluate both against the declared policy.